[OT] Network Cabling Contractor - Quotations Needed

27 Mar
2014
27 Mar
'14
4:57 p.m.
*Scope of works :* - To lay and terminate 4 (four) ethernet cables between two end-points approximately 40m apart. - There's an existing cable trunk in place beneath the floor tiles. - Basically, a good quality 160m ethernet cable (preferably Siemon), 8 RJ45 connectors, a crimping tool and some cable ties should be enough to get the job done. Send your formal quotations for this to emma@movirtu.com Tony.
4051
Age (days ago)
4051
Last active (days ago)
0 comments
1 participants
participants (1)
-
Tony Likhanga