
29 Jul
2010
29 Jul
'10
2:22 p.m.
Benson we also require the following to accompany the fiber optic. 2.5.6 Provide maintenance tools and measuring equipment including; i) Hot melt fibre optic cable terminating equipment including fibre preparation kits with feature testing of the joint Sum ii) Tool box with cable preparation and jointing tools and fastening tools including armored cables No = 3 iii) Powered underground cable locating tool ( both active & in-active ) to a precision of 0.005m to a depth of at least 1000mm Sum iv ) Thermal imaging instruments Sum v ) Supply cable pulling equipment each of 9mm diameter 500m length as by cobra or equivalent No =2