Can I conclude this post?
Thank Alvin and sorry to be a bother to you.... :-)Since you may just have one chance to do the tests as the server would probably be shipped to a client, I'd like to list them as below and updated :** Kindly ensure that the UPS has no external power connected as we are testing the battery/ups consumption. **
a) Connect the AC Wattage meter on the AC side and connect the DC Amps meter on the battery side
- Please note the Server Bootup and surge consumption on both meters in Watts & Amps.
- Please note the power consumption on both meters when server is powered and running while has no OS installed
- Please note the power consumption on both meters when the server is running applications
- Please note the power consumption on both meters when the server has an installed OS but little or no traffic to it.- If you have a digital voltmeter, please note the fully charged state of the combined battery pack i.e 12.7/12.8 etc- During the test, please note the battery pack discharge voltage rate per every 10 minutes or so, until the UPS shuts down.b) The details of the 1.5KVA UPS in use so that we can compare the official specs versus performance, the number of batteries it has and whether the battery manufacturer is Panasonic/Yuasa etc.c) What is the Voltage/Amps of the each battery i.e in Ahd) Is the battery pack combined into 12Volts or 24Volts or 36Volts?Rgds.
On Tue, Dec 7, 2010 at 11:54 AM, Alvin Jason Ochieng <ajochola@gmail.com> wrote:
Aki...I have copied my techies who will do all this this when the server lands.
_______________________________________________
Skunkworks mailing list
Skunkworks@lists.my.co.ke
http://lists.my.co.ke/cgi-bin/mailman/listinfo/skunkworks
------------
Skunkworks Rules
http://my.co.ke/phpbb/viewtopic.php?f=24&t=94
------------
Other services @ http://my.co.ke