
27 Mar
2014
27 Mar
'14
4:57 p.m.
*Scope of works :* - To lay and terminate 4 (four) ethernet cables between two end-points approximately 40m apart. - There's an existing cable trunk in place beneath the floor tiles. - Basically, a good quality 160m ethernet cable (preferably Siemon), 8 RJ45 connectors, a crimping tool and some cable ties should be enough to get the job done. Send your formal quotations for this to emma@movirtu.com Tony.